Guide

Zero downtime deployment, including the database

Zero downtime deployment means shipping new code and schema changes while the application keeps serving traffic. The deploy mechanics – rolling, blue-green or canary – are the easy half. The hard half is the database: every change must be compatible with both the old and new versions of the code running at the same time, which you get by splitting changes into expand, migrate, contract steps.

Most “we had to take the site down for maintenance” incidents come down to a migration taking a lock it didn’t need, not a deploy pipeline problem. This guide covers both halves, with the Postgres specifics that matter.

The rule underneath everything

During any deploy, there is a window when old and new code run side by side: old pods still draining, new ones starting, background workers on the previous release, jobs enqueued by old code processed by new code. So every release has to satisfy two conditions:

  • The new code works with the old schema (or the schema change ships first).
  • The old code works with the new schema.

Any change that breaks one of these – renaming a column, dropping a table, changing a job’s arguments – has to be split across multiple releases. That’s the whole discipline. Everything else is technique.

Deploy strategies: rolling, blue-green, canary

  • Rolling deploys replace instances a few at a time. Default on Kubernetes, ECS and most PaaS platforms. Cheap, but old and new run together for the whole rollout.
  • Blue-green runs two full environments and switches the router from blue to green at once. Rollback is switching back – as long as the database change was backward compatible, because both environments share the database.
  • Canary sends a small percentage of traffic to the new version, watches error rates and latency, then widens. Best for catching problems that only show under real traffic.
  • Feature flags separate deploy from release: code ships dark and is turned on per tenant or percentage. This is how you make risky changes boring.

Whichever you use, three details decide whether it’s actually zero downtime: health checks that verify the app can serve (database reachable, migrations compatible), not just that the process started; connection draining so in-flight requests finish before an instance stops; and graceful worker shutdown so background jobs finish or get re-queued rather than killed mid-way.

Expand and contract: the core zero downtime migration technique

Also called parallel change. Take renaming users.name to users.full_name, which done naively breaks every running instance of the old code. Done safely, it’s a sequence of deploys:

  1. Expand: add full_name as a nullable column. Old code ignores it.
  2. Dual write: deploy code that writes both name and full_name, still reading name.
  3. Backfill: copy name into full_name for existing rows, in batches.
  4. Switch reads: deploy code that reads full_name (still writing both, so a rollback is safe).
  5. Stop writing the old column: deploy code that only uses full_name. Tell the ORM to ignore name – ignored_columns in Rails, or dropping it from the Django model while keeping the column via SeparateDatabaseAndState.
  6. Contract: drop the name column in a later release.

Six steps for a rename feels like a lot. It’s also why you should rename columns rarely. The same pattern handles splitting a table, changing a column’s type, moving data between modules, or retrofitting a tenant_id onto every table.

Postgres operations that take locks you don’t expect

Most schema changes need an ACCESS EXCLUSIVE lock, at least briefly. The problem isn’t the lock itself; it’s that the migration waits behind a long-running query, and every other query then queues behind the migration. A ten-second report can turn a millisecond ALTER into a full outage. The defenses:

  • Always set lock_timeout (a few seconds) for migrations, and retry on failure. A failed migration is better than a queued one.
  • Create indexes with CREATE INDEX CONCURRENTLY. It can’t run inside a transaction, so disable the migration transaction for that step (disable_ddl_transaction! in Rails, atomic = False in Django), and check for an INVALID index if it fails.
  • Add foreign keys and check constraints as NOT VALID, then VALIDATE CONSTRAINT in a separate step. Validation takes a weaker lock and doesn’t block writes.
  • Adding NOT NULL to an existing column scans the table under an exclusive lock. On Postgres 12 and later, add a CHECK (column IS NOT NULL) NOT VALID constraint, validate it, then SET NOT NULL, which uses the validated constraint to skip the scan.
  • Adding a column with a default is a fast metadata change on Postgres 11 and later for non-volatile defaults. Older versions rewrite the table.
  • Changing a column type usually rewrites the table. Use expand and contract instead.
  • Lint migrations in CI. strong_migrations for Rails and django-pg-zero-downtime-migrations or similar tools for Django catch most of these before review.

MySQL has its own set of rules (online DDL algorithms, gh-ost and pt-online-schema-change for large tables), but the principles are the same: avoid table rewrites, keep locks short, and never let a migration wait indefinitely.

Backfills that don’t hurt production

  • Run them as background jobs, not inside the migration. A migration that updates ten million rows holds locks and blocks the deploy.
  • Batch by primary key range – a few thousand rows per batch – and commit each batch. Avoid OFFSET pagination; it gets slower with every page.
  • Throttle with a short sleep between batches, and watch replication lag if you have replicas.
  • Make it idempotent and resumable. Only update rows that still need it (WHERE full_name IS NULL), so a restart picks up where it left off.
  • Verify before contracting. Count rows that still don’t match before you deploy the step that depends on the backfill being complete.

The parts people forget

  • Background jobs. A job enqueued by old code with old arguments will be processed by new code. Keep job signatures backward compatible for at least one release, and don’t delete a job class while instances might still be in the queue.
  • Caches. Serialized objects in Redis from the old version may not deserialize in the new one. Version cache keys when the shape changes – see caching strategy.
  • API clients and mobile apps. Old app versions stay in the wild for months. Additive API changes only, and version anything breaking.
  • Static assets. Fingerprint them and keep the previous release’s assets available, or users with an open tab get 404s on the next click.
  • Rollback. Practice it. A rollback that’s never been tested is a second outage waiting to happen.

Where to start

If deploys currently need a maintenance window, start with three changes: lock_timeout on every migration, a migration linter in CI, and a written rule that destructive changes ship in a separate release from the code that stops using them. Those alone remove most deploy-related downtime.

Deploy safety also shows up directly in your DORA metrics – change fail rate and failed deployment recovery time – so it’s worth tracking before and after. If you want hands-on help getting there, that’s part of my DevOps consulting work, and it’s a common first step in Heroku migration projects where the new platform makes these patterns easier.

Questions

What is zero downtime deployment?

Releasing new application code and database changes without interrupting service. It combines a deploy strategy that keeps serving traffic – rolling, blue-green or canary – with database changes that are compatible with both the old and new code, typically using the expand and contract pattern.

How do you do a zero downtime database migration?

Split breaking changes into compatible steps: add new structures, write to both, backfill in batches, switch reads, stop using the old structure, then remove it in a later release. Set a lock_timeout, create indexes concurrently, and add constraints as NOT VALID before validating them separately.

What is the difference between blue-green and canary deployment?

Blue-green runs two complete environments and switches all traffic at once, making rollback a single switch. Canary sends a small share of traffic to the new version first and widens gradually while watching metrics. Both share the database, so schema changes must be backward compatible either way.

Can you rename a column without downtime?

Yes, with expand and contract: add the new column, write to both, backfill, switch reads, stop writing the old column, then drop it in a later release. It takes several deploys, which is why it’s worth avoiding column renames unless the benefit is clear.

Still scheduling maintenance windows?